Consider shower bases, waterproofing, tile, a bench, niche, half wall and glass as one coordinated assembly.
What goes into the job
- Confirm footprint, drain location, curb or entry and seat requirements.
- Select the waterproofing system and tile details before installation.
- Coordinate glass measurements after the tiled surfaces are complete.
What affects the scope?
Footprint, drain position, bench or niche details, tile format and custom glass shape matter. The estimate follows the on-site conditions and the choices you make.
Getting a useful estimate
Send photos, approximate measurements and a short description of what you want changed. We’ll review the existing conditions, discuss the scope and explain what is included in the estimate. Hidden conditions or changes discovered during work are discussed before extra work is added.
When is custom glass measured?
The final measurement is generally taken after the surrounding finished surfaces are in place.